“BAŞPINAR – GAZİANTEP – M. YAVUZ İSTASYONLARI ARASININ YENİDEN İNŞAA EDİLMESİ ALTYAPI VE ÜSTYAPI (GAZİRAY) YAPIM İŞİ” aka “GAZİRAY” consist of 4 lines running in parallel for approx. 25 km (100 km as a single line) and 16 stations from Başpınar to Mustafa Yavuz. Design of the open line and station overhead catenary systems from basic design to detail design are in the scope of the project. Following reports and drawings to be prepared as basic and detail design documentation.
- Basic Design
- Feeding Plan
- System Description Report
- Foundation Calculation Report
- Pole Calculation Report
- Earthing and Bonding Concept
- Material Drawings (Portal, Drop Column etc.)
- Detail Design
-
- Layout Plans (Picketing Plans)
- Foundation Carnets